Measure each trench, pit or fill zone, then apply the factor supplied for bulking, shrinkage, handling or compaction.

No layout needed

Calculation details

Update the example values below. Results update as you type.

01Measurements
ft
ft
ft
02Material detailsUnit sizes, mix ratios and allowances.
%
03Rates (optional)
INR/ft³
INR/ft³

How the quantities are calculated

Follow the method, check the example and review the assumptions.

The method

From measurements to materials

Measured volume = length × width × depth × quantity. Adjusted volume = measured volume × user-entered factor.

An example

Put the numbers in context

A 5 m × 1 m × 1 m trench is 5 m³ measured volume before any bulking, shrinkage or handling factor.

This illustrates the method; your inputs determine your result.

Assumptions to check

  • Each repeated zone has the same dimensions.
  • The volume factor is supplied for the applicable soil and operation.

Limits of this calculation

  • Side slopes, shoring, groundwater, disposal distance and soil classification are not determined by the calculator.

Common questions

What belongs in the volume factor?

Use a value provided for the project’s soil and operation. Leave 1.0 when no adjustment is being applied.

Will this tell me a safe excavation slope?

No. Excavation safety and shoring require site-specific professional decisions.