Plaster Cement and Sand (Ret / Badarpur) Calculator

Use the net surface area and average thickness to find the wet plaster volume, then split the dry ingredients into cement and sand.

No layout needed

Calculation details

Update the example values below. Results update as you type.

01Measurements
ft²
ft²
Add measured jambs, heads and applicable sills. Room-based estimates calculate these from each opening reveal depth.
in
02Material detailsUnit sizes, mix ratios and allowances.
kg/m³
kg
%
03Rates (optional)
INR/bag
INR/ft³
INR/ft²

How the quantities are calculated

Follow the method, check the example and review the assumptions.

The method

From measurements to materials

Wet volume = area × thickness. Dry volume = wet volume × dry factor, divided by the entered cement:sand parts.

An example

Put the numbers in context

Ten square metres at 12 mm is 0.12 m³ wet plaster. With a 1.33 factor, dry ingredients total 0.1596 m³ before wastage.

This illustrates the method; your inputs determine your result.

Assumptions to check

  • Flat area is net of openings and unplastered sections.
  • Measured jamb, head and applicable sill faces are added separately.
  • Thickness is an average across the measured surface.

Limits of this calculation

  • Uneven backgrounds and levelling can materially increase thickness and usage.

Common questions

Can I use a different plaster ratio?

Yes. Ratio and dry-volume factor are editable under assumptions so they can match the project specification.

Does this include wall putty?

No. Putty is a separate finish calculated from product coverage and surface area.